Construction of the current St. Francis Church was completed in the Fall of 2004 after breaking ground in August 2003. In November 2004 our Dedication Mass was held .
Directions to our church are available by clicking here.
Click here for a description of the interior design of our church.
Click here for interior photos of our church.
Return to [Top of Page] [Home]
Rectory
In the spring of 2010, we began work on our second phase of our complex--a new Rectory! Our general contractor is John Girard of Girard Builders Inc. (www.girardhomesinc.com). A description of the Rectory is provided below.
Description
The house is 2,696 sq ft
First floor is 1,904
Second floor is 792
Basement for parish storage is 1,904 sq ft
Exterior wall framing will be 2x6
The garage is being expanded by 4 ft on two sides to accommodate the stairs to the basement and our lawn and snow removal equipment.
The house will feature the same stone work as the church along with the white pillars and roof shingles. The rest of the house will be done in the same color siding as the church with white trim and black shutters.
With land development, meeting all wetland and environmental issues, the cost will be $359,355.00
Sketch/Floor Plans
A
sketch of the home and floor plans are available here.
Rectory Photos
Construction
of the rectory was completed in December 2010. Photos of the completed
rectory are available below.
Completed Rectory (added 1/22/2011)